
Station-side roads, 1894 to 1912
Bellclose, Brandville, Warwick and Furzeham Roads and the Parade were laid out south of the station.

Roofs on the station-side roads, Bell Farm and the old Green
West Drayton grew round its Green and its station, with roads laid out from 1894 and the Bell Farm estate from 1935. We survey those roofs and write one price.

Bellclose, Brandville, Warwick and Furzeham Roads and the Parade were laid out south of the station.

Housing began on the former open fields of Bell Farm after slum clearance orders in 1935.

Old Meadows in Mill Road is a 16th-century timber-frame and brick-nogging building.
Map of West Drayton with Richings Park, Iver, Hayes, Poyle marked around it.
Map data © OpenStreetMap contributors. Loads only when you ask for it.
Richings Park lies to the west, Iver to the north-west, Uxbridge to the north and Hayes to the east, with Poyle and Colnbrook a short way off, all within about three miles.
About 23.1 road miles north-east of Farnborough · London Borough of Hillingdon (unitary).
West Drayton, from the record
Who inspects roof work at West Drayton, how the roads by the station and the Bell Farm estate grew, and what the conservation area and listings mean for a repair, each figure sourced.

| No. | Chapter | The figure it turns on |
|---|---|---|
| 01 | Hillingdon, flat roofs and Part L | A new flat roof membrane counts as renovation |
| 02 | Brick, the station and the Bell Farm estate | Station-side roads laid out 1894 to 1912 |
| 03 | West Drayton Green and its listed buildings | St Martin's, Grade II*, by faculty |
Chapter 01 of 03
| Role | Body for West Drayton |
|---|---|
| Planning authority | London Borough of Hillingdon (unitary) |
| Building control | Hillingdon's own Building Control service |
| Private building control | Registered building control approver, since 6 April 2024 |
| Local council tier | Hillingdon, unparished area: no parish council |
| Scaffold licence | Highway authority, Highways Act 1980 s169 |
West Drayton belongs to Hillingdon, the London borough that serves as its unitary council, and as an unparished area it has no parish or town council of its own. Hillingdon is both planning authority and building control body, through a service of its own. Measured from the A325 at Farnborough, it is 23.1 road miles to West Drayton, and we book the survey as a fixed appointment so one visit covers every slope, with photographs and measurements.
Approved Document L, the Part L guidance for homes, counts a new waterproof membrane on a flat roof as renovation. Under Table 4.3 of the 2021 edition, a renovated roof worse than 0.35 W/(m²·K) is upgraded to 0.16. If the upgrade is impractical, or would take longer than 15 years to repay, paragraph 4.13 asks for the best result that is feasible. The 2026 edition takes effect on 24 March 2027 with the same tables renumbered 3.2 and 3.3, so a flat roof re-covered this winter follows the 2021 edition.
The fall matters as much as the insulation. BS 6229:2025 sets a minimum finished fall of 1:80 for flexible membrane roofs, and IKO advises a design fall of 1:40. Table 4.2 adds that an upstand built on site should reach no more than 0.35 W/(m²·K). On the survey we take levels along the roof, note the outlets and upstands, and show you the readings, because standing water after rain is the earliest warning that a fall has gone.
The covering decides how long a re-cover can be expected to last. HomeBuilding gives EPDM 25-30 years and Less gives 30 to 50 years, so the two sources disagree. For GRP they give 25-30 and 25 to 40 years, and for torch-on felt 10-15 and 10 to 20 years. Treat each as a published range and no more, since the covering that suits your roof is something we judge on site.
Section 169 of the Highways Act 1980 deals with scaffolding that gets in the way of the highway, and a licence comes from the highway authority. Your own drive is private land and needs none. For poles on the footway, ask the scaffolder which of you files the application, and we fix the dates with the scaffolder so the roof work is not left waiting.
Chapter 02 of 03
Dates that shaped West Drayton's roofs
The Victoria County History's 1962 account of West Drayton gives the growth of the place in dates. Brick-making was established here by 1845 at the latest, and the account says it helped transform the look of the parish. It records soil of red brick-loam over gravel, and older buildings of timber frame with brick nogging or brick facing. Brick nogging is brickwork filling the spaces between the timbers of a frame.
Most of the early suburban building was immediately south of the station. Bellclose, Brandville, Warwick and Furzeham Roads and the Parade were laid out between 1894 and 1912, and from 1912 to 1935 development spread south to and across Church Road. Houses on those roads are over a hundred years old, and many a roof there will have been patched, re-covered or both. We lift enough to see what is there and photograph it, so the age of the house is never taken as the age of the roof.
The urban district council turned to the open fields after extensive slum clearance orders in 1935, acquiring and beginning to lay out the Bell Farm estate. The account calls it the first significant housing on those fields. Homes laid out in one programme share details, so a defect on one Bell Farm roof is a cue to inspect the rest of that road, while each owner still gets separate findings. Housing of that era is now many decades old, which is why gutters, flashings and fixings get as much attention as the tiles.
HSE's advice is to treat a pre-2000 building as asbestos-bearing until a survey says otherwise. Garage sheets, soffits and rainwater goods are therefore checked before anyone disturbs them; asbestos cement lifted with care is non-licensed work, and its waste is consigned, not skipped.
Two building dates
The Frays in Money Lane is a 15th-century timber house faced with brickwork, and Old Meadows in Mill Road is a 16th-century building of timber frame and brick nogging. Historic England's list places St Martin's Church and The Old Gatehouse at Grade II*, both first listed on 1 March 1950. Buildings with timber frames have roof structures that follow the frame, so repairs follow the line of the timber beneath. Our pitched roofing page describes slope repairs that leave the structure undisturbed.
Chapter 03 of 03
| Designation | At West Drayton | For roof work |
|---|---|---|
| Conservation area | West Drayton Green | Changes to the look checked with Hillingdon |
| Grade II* listed church in use | Church of St Martin (NHLE 1358325) | Faculty system, not council consent |
| Grade II* listed | The Old Gatehouse (NHLE 1193001) | Listed building consent |
| Grade II listed | Drayton Hall, Council Offices (NHLE 1358345) | Listed building consent |
West Drayton Green is a conservation area, so altering the appearance of a roof around it is a question for Hillingdon's planning team before it is a question of cost. Putting back the same covering, ridge and details is one thing. A new material or a new roofline is another, and it goes to the council first. Hillingdon is also the body to ask whether an Article 4 direction touches your address. Our planning permission for roof work guide sets out how to ask.
St Martin's remains in Anglican use, so its roof falls under the faculty system, the denomination's own route, and not under the council. That is worth knowing if your own roof backs onto the churchyard, because the two follow different rules.
The Old Gatehouse carries a Grade II* listing. Drayton Hall, entered on the list as Drayton Hall (Council Offices), is listed at Grade II. Alterations to a listed building's special character need listed building consent, and that consent runs alongside any Building Regulations route. Work on such a building starts once the consent is in place.

Roofs near the Green are best handled by recording first. The ridge line, verges, chimneys and gutters are photographed before pricing, giving a baseline for any later comparison. If a gutter or fascia has failed, our gutters, soffits and fascias page covers renewal of the roofline.
Terraces and semis share party walls. Under the Party Wall etc. Act 1996, a party wall or a projecting chimney breast cannot be cut into without two months' notice to the neighbour or their written consent. Questions about that notice go to a party wall surveyor, not to building control, and our survey photographs show both owners the same picture.
Opening an old roof can also disturb wildlife. Section 1 of the Wildlife and Countryside Act 1981 is an offence where a person intentionally harms a nest that is occupied or being built. Bats and their roosts are protected more strictly, and the Habitats Regulations 2017 apply whether or not the damage was intended. If we see signs of either, work pauses until you have our advice.
Matching the existing covering and details is a different question from altering how the roof looks. Ask Hillingdon's planning team about any alteration, and whether an Article 4 direction applies at your address. We photograph the roof as it is now, so you can send the council a clear record and keep a copy for your own file.
It can. Approved Document L treats a new membrane on a flat roof as renovation, so a roof worse than 0.35 W/(m²·K) is improved towards 0.16, or to the best that is feasible within a 15-year payback. We check the build-up at the survey and tell you plainly which applies.
No. Although St Martin's is Grade II* listed, its roof works are for the faculty system, the Anglican route, not for Hillingdon. The Old Gatehouse shares the grade yet is no church in use, so listed building consent is its route whenever its character would change.
Ask the scaffolder first, because the council's rules on who applies differ between councils. A licence under section 169 of the Highways Act 1980, granted by the highway authority, covers scaffolding that obstructs the highway. Anything inside your own boundary is private land, so no licence is involved, and a rear-garden scaffold can often start sooner.
Get your free roof quote
Tell us the West Drayton road and the fault, and we will book the survey and send one price in writing.
10-year workmanship guarantee, in writing.