Fortis Roofing Farnborough 01252 596302 Get a quote

Lead roofing and leadwork in Farnborough

Flashings, valleys and lead roofs, in the right code

We inspect the lead where your roof meets walls, chimneys and dormers, photograph every joint, and tell you which pieces need re-fixing and which need renewing.

Get a free quoteCall 01252 596302

  • Photos and measurements
    of your roof
  • One written
    price
  • Repairs, re-roofs
    and emergencies
  • 10-year workmanship
    guarantee

Find us on Google

Lead-covered bay roof and dormer on a brick house

Signs your leadwork needs attention

  • Flashing lifting away from the brickwork
  • Mortar missing from the flashing chase
  • A damp patch on a chimney breast
  • Splits or cracks along the lead folds
  • Sealant smeared over old lead joints

Why lead is worth using where roofs meet walls

Lead flashing dressed into old brickwork at the side of a roof

Cast lead sheet

Codes 3 to 8, from small soakers up to box gutters.

Brick chimney with lead flashing on a grey slate roof among houses

Lead flat roofs

HomeBuilding gives lead on a flat roof 60-100 years.

Brick chimney stack with lead step flashing set into a clay tile roof

Lead flashings

Over 80 years for lead flashing, on MyJobQuote's figure.

Leadwork we fit and repair

  • Chimney flashings and aprons
  • Soakers and step flashing
  • Lead valleys
  • Bay and porch roofs
  • Dormer cheeks and tops
  • Box and parapet gutters

Re-fix, repair or renew the lead?

Re-fix

The lead is sound but has slipped from its chase or lost its wedges.

Repair

One piece has split or was cut short, and the rest is in good order.

Renew

The lead is thin, cracked in several places or the wrong code for the job.

Leadwork, code by code

Lead on the roof, measured against the published figures

Lead codes and weights, typical lifespans beside other coverings, conservation rules and the energy standard for a relaid lead roof, with every figure tied to the guide or council that published it.

Chapters of this guide and the figure each one turns on
No.ChapterThe figure it turns on
01Where lead sits on an ordinary houseCodes 3 to 8, 1.32 to 3.55 mm
02Matching the lead code to the jobCode 4: 1.80 mm, 20.41 kg/m²
03How long lead lasts beside other coveringsLead flat roof: 60-100 years
04Leadwork on listed and conservation homesHart's 1998 directions cover frontage slopes
05Relaying a lead roof: the energy rules0.35 to 0.16 W/(m²·K) on renovation
06Re-dress, repair or renew old leadworkChimney leadwork renewals cost £350 to £920

Chapter 01 of 06

Where lead sits on an ordinary house

The range of cast lead sheet and the standard it follows

  • Codes 3 to 8six cast lead sheet codes in Royston's range
  • 1.32 mmCode 3, the thinnest, listed for soakers only
  • 3.55 mmCode 8, the thickest, for valley gutters and dormers
  • BS 6915:2001the lead sheet roofing code Approved Document C names
Source: Royston Lead cast lead sheet brochure; Approved Document C, 2013 edition, para 6.9; accessed 28 October 2026

Lead seals the joints that a tile or slate cannot. On a house in Farnborough, Camberley or Farnham you can expect to find it in up to five places: soakers, flashings, aprons, valleys and the small flat roofs over bays, porches and dormers. Each piece is sheet lead cut to size, then dressed (beaten and folded with wooden tools) to fit the brick, tile or timber it meets. Approved Document C, the Building Regulations guidance on keeping moisture out, points to BS 6915:2001 for lead sheet roofing. The flat-roof standard BS 6229 is written for membranes, not for lead.

Soakers, step flashings and aprons

Where a tiled slope runs up beside a wall or chimney, a soaker sits under each course of tiles: a small square of lead, turned up against the brick, that carries water back out onto the tiles below. Over the soakers runs a step flashing, cut in steps to follow the brick courses. Its top edge is tucked into a groove in the mortar joint called the chase, held there with folded lead wedges and sealed with mortar pointing. Across the downhill face of a chimney or the bottom of a dormer lies an apron flashing, dressed over the tiles. Behind a chimney, a back gutter of lead on the high side turns rain around the stack.

Soakers under step flashing
Each step of the flashing is wedged into a mortar joint above the soakers.

On some older houses there are no soakers at all, and a sloping fillet of sand and cement does their job. That fillet shrinks and cracks away from the brickwork over the years, and the damp patch it causes on a chimney breast is a common reason for a call about leadwork.

Valleys, bays, porches and dormers

Valleys are the inside corners of a roof, where two slopes meet and drain into one lead-lined channel that runs the rain from both down to the gutter. Bay windows, porch canopies and dormer tops are small flat or shallow roofs, and on period houses many are covered in lead laid over timber boards, with rolls and drips (raised joints and small steps) where one sheet meets the next. Dormer cheeks, the triangular side walls of a dormer, can be clad in lead as well.

Every one of those details is a joint, and a joint is where a roof leak begins when something moves, cracks or was fitted short. The lead itself is seldom the first part to go. Far more often the mortar in the chase drops out, a wedge works loose and the flashing lifts in the wind, or an earlier repair smeared sealant over a joint instead of re-fixing it. Our guide to lead flashing repair follows a proper repair from raking out the chase to the final pointing.

Chapter 02 of 06

Matching the lead code to the job

Royston Lead codes by thickness, weight per square metre and listed use
CodeThickness and weight per m²Royston lists it for
Code 3 (green)1.32 mm, 14.97 kgSoakers and nothing else
Code 4 (blue)1.80 mm, 20.41 kgSoakers, flashings, pitched valleys, dormers
Code 5 (red)2.24 mm, 25.40 kgFlashings, every valley and box gutter type, dormers
Code 6 (black)2.65 mm, 30.05 kgThe same uses as Code 5
Code 7 (white)3.15 mm, 35.72 kgValley, parapet and box gutters, dormers
Code 8 (orange)3.55 mm, 40.26 kgValley, parapet and box gutters, dormers
Source: Royston Lead cast lead sheet brochure, accessed 28 October 2026

Each lead code stands for a fixed thickness and weight of sheet. The table sets out Royston Lead's figures for its cast lead range, with the colour mark that identifies each code on a roll and the jobs its brochure lists the code for. The pattern is simple: the harder a piece of lead has to work, and the more water it has to carry, the heavier the code it is listed for.

Where the lighter codes belong

Code 3, at 1.32 mm and 14.97 kg per square metre, is listed for soakers only. Soakers sit hidden under the tiles and carry a small amount of water each, so a light sheet does that job. Code 4, at 1.80 mm and 20.41 kg, is the lightest code Royston lists for flashings, and it also covers pitched valley gutters and dormers. On a typical chimney, the step flashings, apron and back gutter are therefore Code 4 or heavier, and the soakers beneath can be Code 3 or Code 4.

A step flashing cut from Code 3 is a short cut. It will dress into place and look the same from the ground, but it is thinner than any code listed for that use, and that difference shows when the inspection gets close to it.

Where the heavier codes go

From Code 5 upwards, Royston adds parapet, box and tapered valley gutters to the list. A box gutter is a lead-lined channel running behind a parapet wall or between two roofs, where water sits and runs for its whole length rather than draining straight off a slope. Codes 7 and 8, at 3.15 mm and 3.55 mm, are listed only for valley gutters, parapet and box gutters and dormers, not for flashings, since that weight of sheet is more than a flashing needs.

The colour marks matter on site. A roll of new lead carries its code's colour, so when we propose a code you can see the matching mark on the material when it arrives. On old work the colour is long gone, so we measure the thickness of a cut edge where we can reach one, and record it with the photos.

Our answer on Code 4 against Code 5 lead works through the choice for chimneys, valleys and bay roofs one job at a time.

On a domestic chimney in Farnborough or Fleet, a full set of leadwork means soakers, a step flashing down each side, an apron across the front and a back gutter behind. Each piece has its own job and its own listed code, so a quote that names one code for everything is worth a question before you sign it.

Chapter 03 of 06

How long lead lasts beside other coverings

Typical working life of lead, zinc and the flat-roof membranes, in years

  • Torch-on felt10-15 years
  • EPDM25-30 years
  • GRP25-30 years
  • Lead flat roof60-100 yearsUp to 100 years, HomeBuilding
  • Lead flashingover 80 years
  • Zinc100 years
Source: HomeBuilding, updated 30 September 2025; MyJobQuote leadwork guide, updated 22 September 2026; VMZinc citing the BRE Environmental Product Declaration. Typical figures, never a promise.

The chart puts lead next to the coverings a small flat roof could have instead. HomeBuilding gives lead on a flat roof a typical life of 60-100 years, against 25-30 years for EPDM rubber and for GRP (glass-reinforced plastic), and 10-15 years for torch-on felt. MyJobQuote's figure for lead flashing is over 80 years, and that figure is a floor, not a ceiling. VMZinc quotes the BRE Environmental Product Declaration for zinc at 100 years. All of these are national figures from guides and makers, and a roof's own life depends on how it was laid and looked after.

Lead against a membrane on a small flat roof

On a bay window, porch or dormer top, the choice is usually between relaying in lead and switching to a membrane. Lead costs more at the start: HomeBuilding's supply-only figures put lead at £170 per square metre, against £105 for EPDM, £110 for GRP and £65 for felt. Over the life of the roof the picture changes, because the membranes on those figures can need replacing two or three times inside one lead roof's typical span.

Lead also suits the shapes those small roofs take. It can be dressed around a curved bay, into a corner or over a roll by hand, and it matches the lead flashings and valleys already on the house. On a period house in a conservation area, keeping the bay in lead can also be the expected route, which the next chapter covers.

A membrane has its place, too. Where a dormer or porch roof is plain and flat, where budget is tight, or where theft of lead from a low roof is a worry, EPDM or GRP can be the sensible answer, and our flat roofing service lays both. We set the options side by side on the survey and say which we would choose for your roof.

For a homeowner weighing up a bay or porch roof, the useful comparison is cost over the roof's whole life rather than cost on the day, alongside how the finished roof will sit against the brick, stone and joinery of the rest of the house.

Lead and zinc

Zinc is the other long-life sheet metal on roofs, used for cladding and some flat and curved roofs. Its BRE figure of 100 years sits at the top of the chart, beside lead's 60-100 for a flat roof. On a house that already has lead valleys and flashings, matching the metal keeps the details consistent. Our guide to how lead flat roofs are built and how long they last covers the boards, rolls and drips beneath the sheet.

Chapter 04 of 06

Leadwork on listed and conservation homes

Roof-relevant conservation and Article 4 wording, by council
CouncilPublished positionRoof detail
RushmoorNine designated conservation areasCargate direction: chimneys and flues
Hart1998 directions on most conservation areasFrontage roof slopes and chimneys on a dwelling
GuildfordArticle 4 used to control conservation area changesNo removing or altering a chimney without permission
Basingstoke and DeaneFour town-centre conservation areasRoof changes need planning permission
Waverley44 conservation areasNo roof direction listed; check by address
Source: Rushmoor Borough Council, Hart District Council, Guildford Borough Council, Basingstoke and Deane and Waverley Borough Council planning pages; accessed 28 October 2026

Lead is part of how many older houses look, from the bay roofs of a Victorian terrace to the flashings on a tall chimney, so changing it can be a planning matter as well as a roofing one. On an ordinary house, Class C of the permitted development rules normally covers re-roofing, and a repair that does not materially affect the outside appearance is not development at all. Flats have no permitted development rights, and listed buildings need listed building consent for works that affect their character, on top of any other permission.

Conservation areas and Article 4 directions

In a conservation area, an Article 4 direction can withdraw permitted development rights for named kinds of work. Rushmoor has nine designated conservation areas, including Farnborough Hill and Farnborough Street (both 2025), South Farnborough and St Michael's Abbey. Its Cargate direction in Aldershot, an immediate direction made on 31 July 2020, covers chimneys and flues: putting one in, changing one or taking one out, on a face visible from a road or public open space. Hart's 1998 directions cover most of its conservation areas, including Crondall, Odiham's West Street and Hartley Wintney, and take in works to a frontage roof slope and to chimneys. In Guildford, any address under a direction needs permission before a chimney is altered or taken down. Basingstoke and Deane says original materials such as Welsh slate and clay tiles should be retained in its four town-centre areas.

Hart's guidance is helpful on repairs: an unlisted building needs no planning permission for repairs carried out the traditional way, to the exact original details and in the same materials. Renewing a lead flashing or bay roof in lead, matching the original, fits that description. Swapping lead for a different material on a front-facing roof may not, so it is checked with the council first. Everywhere else in the area, check whether an Article 4 direction applies with your council before a change of material. The boundaries of each conservation area are on the council's own map, so check your address there before planning any change to a bay, porch or chimney that faces the street. Small roof repairs in lead are ordinary work, but on a listed house the consent question is about character, not about how big or costly the job is.

Roof directions

Hart, 1998frontage roof slopes and chimneys on a dwelling
Cargate, 2020Rushmoor: works to chimneys and flues seen from a highway
Source: Hart District Council; Rushmoor Borough Council

Churches and the abbey

A Church of England church in use goes through the faculty system rather than the council. Roman Catholic, Methodist and URC churches use their own systems: St Michael's Abbey in Farnborough, a Benedictine monastery, goes through the Catholic Church's own approval route. Our guide to lead roofing on listed and period buildings covers consent and like-for-like detailing in more depth.

Chapter 05 of 06

Relaying a lead roof: the energy rules

Approved Document L figures for a renovated roof in an existing home

  • 0.35roof U-value threshold that calls for an upgrade
  • 0.16the improved roof U-value in Table 4.3
  • 15 yearssimple payback test in para 4.13
  • 24 March 2027start date for the 2026 edition in England
Source: Approved Document L Volume 1, 2021 edition incorporating 2023 amendments, Table 4.3 and para 4.13; AD L 2026; accessed 28 October 2026

Relaying a lead bay, porch or dormer roof is more than a roofing job in the eyes of the Building Regulations. Approved Document L classes the replacement of a flat roof's waterproofing as renovation, and renovation brings the energy standard into play. The figures in the panel come from Table 4.3, which deals with existing elements of a home.

Insulation on a small lead roof

Under Table 4.3, where a roof being renovated has a U-value worse than 0.35 W/(m²·K), it should be improved to 0.16. The U-value is a measure of heat loss, and the lower the figure, the less heat escapes. Paragraph 4.13 adds a test of sense: if the 0.16 target cannot be met for practical or technical reasons, or the cost would take longer than 15 years to win back in saved energy, the aim becomes the best result achievable inside that 15-year payback. Once upgraded, a roof should generally be no worse than 0.7. For dormer windows, Table 4.3's note says the roof includes the roof parts of the window.

On a small bay or porch roof, the practical limit is height. Insulation added above the boards raises the roof, and that changes where the lead meets the window head, the wall and the flashing above it. Insulation added below, from inside, avoids that but needs ceiling access. Which route is feasible is a question for the survey, and the answer goes to your building control body.

The lead details have to be set out again over the new build-up as well. Rolls and drips are re-formed on the new deck, and the upstands against the wall still need to rise far enough under the flashing to keep the joint watertight in driving weather. We show you both insulation options with the photos before you choose.

The standard is changing. AD L 2026 takes effect on 24 March 2027 for work in England, renumbering the tables as 3.2 and 3.3 and moving the payback rule to paragraph 3.14. Work before that date follows the 2021 edition.

Ventilation and building control

Approved Document C asks that roofs resist rain getting in and that condensation inside them does not harm their structure or insulation. It also accepts that a little roof over a porch or bay can sometimes manage without ventilation, so each one is judged on its own build-up. In Rushmoor and Hart the council route is the Hart and Rushmoor Building Control Partnership on 01252 398715; a registered building control approver is the private alternative. Our chimney repairs service picks up the stack when flashing work shows the brickwork needs attention too.

Chapter 06 of 06

Re-dress, repair or renew old leadwork

What we find on old leadwork, what it points to and the usual answer
What we findWhat it points toUsual answer
Flashing pulled out of its chasePointing failed, lead still soundRe-wedge, re-dress and repoint
Split along a fold or fixingPiece too long or held too tightlyReplace that piece in the right code
Sealant smeared over a jointA stopgap from an earlier visitStrip back and redo the lead
Valley lead thin or pittedNear the end of its working lifeNew valley lining in a listed code
Mortar fillet in place of soakersNo lead at the abutmentLift tiles, fit soakers and flashing
Source: Approved Document C (2013) paras 6.8 and 6.9; Royston Lead brochure for the codes; accessed 28 October 2026
Valley lead worn thin
Worn valley lead is renewed in a code listed for that gutter.

Old lead is often better than it looks. A flashing that has pulled out of the wall is usually sound metal whose fixing has failed, and the table sets out the faults we find most on inspection and what each one points to. Approved Document C wants every part of a roof fixed in an appropriate manner, and for lead that means wedged into the chase and pointed, never glued on. Where the same fault turns up on several chimneys or valleys across one roof, it points to how the lead was first fitted, and that is worth knowing before deciding how far a repair should go.

Why sealant is a stopgap

A tube of sealant along the top of a flashing is the quickest answer to a drip, and it can hold for a season. It does not put the lead back into the chase, replace the wedges or stop the mortar behind it crumbling, so the water runs round it. Sealant over a split also stops the lead moving, which can open a new split beside the old one. Our guide on why sealant is not a lead repair goes into the detail.

Re-dressing is the next step up: the lead is eased back into shape, re-wedged and the chase repointed. Where a piece has split, that piece is cut out and replaced in a code listed for its use. Where valley lead has worn thin across its length, a new lining is the answer, and the tiles either side are lifted and relaid to fit it. Our answer on whether to repair or replace old leadwork sets out the evidence for each.

What sets the price of leadwork

MyJobQuote puts full chimney leadwork at between £350 and £920, depending on scaffolding, and says most full roof valley replacements cost around £540. Those are typical UK figures, not ours. The things that move a price are access, the size and number of pieces, the code, and what the inspection finds behind the lead. A chimney flashing reached from a roof ladder is a different job from one that needs scaffold on a pavement, which in Hampshire means a licence from Hampshire County Council with ten clear working days' notice. Chimney repointing often goes with flashing work, since lead wedged into crumbling mortar will not stay put.

If you are weighing up quotes, look for VAT and scaffold in each total, and ask which lead code is proposed for each piece. Roof repairs to lead are small in area but often awkward to reach, around a chimney stack or behind a parapet, so planning the access is part of every price we give.

The codes and guidance behind this page

  • BS 6915:2001Lead sheet roofing, cited in AD C
  • Approved Document C (2013)Each sheet and tile fixed appropriately
  • AD L 2021, Table 4.3Renovated roofs: 0.35 and 0.16

Have your leadwork inspected

Tell us where the damp shows, and we will inspect the lead, photograph each joint and price the repair or renewal.

Get a free quote

Typical UK prices for leadwork

Typical UK prices for leadwork
JobTypical UK range
Full chimney leadwork, depending on scaffolding (MyJobQuote)£350 to £920
Full roof valley replacement (MyJobQuote)around £540
Lead for a flat roof, supply only (HomeBuilding)£170 per m²

Source: MyJobQuote leadwork and roof valley guides (September 2026); HomeBuilding (September 2025)

UK cost guide figures, not ours. After the inspection you receive one written total for your roof.

Lead codes, flashing and repair guides

Short reads on lead codes, flashings, bay and porch roofs, listed homes and why sealant is no substitute for lead dressed into the wall.

Guide · 9 min read

Lead Bay Window Roofs

A lead bay window roof is small, exposed and full of joints. It can last for decades when…

From inspection to the last wedge

  1. Tell us where the damp shows
  2. Inspection and close-up photos
  3. One written price, code named
  4. Lead dressed, wedged and pointed

Leadwork questions from Hampshire and Surrey homes

Can sealant fix a leaking lead flashing?

Only for a short while. Sealant can slow a drip, but it does not put the lead back into its chase, replace lost wedges or repair the mortar that let go. The lasting repair is to rake out the joint, re-dress and re-wedge the lead, then repoint it so the flashing is held mechanically again.

Why does lead flashing pull away from the wall?

Usually because the mortar in the chase has cracked and dropped out, often after years of rain and frost. Without that mortar the wedges loosen, and wind can then lift the flashing and let water run behind it. The lead itself is often still sound and can be re-dressed, re-wedged and repointed.

Should the lead be renewed when the roof is re-tiled?

The soakers and flashings at walls and chimneys have to come out when the tiles beside them are stripped, so a re-roof is the natural time to check them. Sound lead can sometimes go back, while thin or split pieces and worn valley linings are renewed. The survey photos show which applies to yours.

How can I tell if my chimney flashing is leaking?

After rain, check the chimney breast and the ceiling next to it for damp, and look for stained timbers around the stack in the loft. From the ground, flashing that has lifted, gaps in the pointing above it or a line of sealant are clues. A close inspection then pins down the entry point.

Do I need planning permission to replace lead on my roof?

On a house, not normally: like-for-like repairs that do not change the outside appearance are not development, and Class C permitted development covers re-roofing. Flats have no permitted development rights, a listed building may need listed building consent, and an Article 4 direction can apply in some conservation areas, so check first.

Get your free roof quote

Book a leadwork inspection

Send a photo of the flashing or the damp patch, and we will arrange to inspect the lead.

01252 596302

10-year workmanship guarantee, in writing.

WhatsApp us