The short answer
Roofers reach a roof by ladder, tower or scaffold, depending on height, pitch and where the house stands. Low, simple roofs can be done from a ladder with a roof ladder on the slope. Taller or awkward ones need a tower or scaffold. If scaffolding stands on or over the pavement or road, a licence from the highway authority is needed first.
Ladders, towers and scaffold
Three kinds of access cover most roof cleaning, and each suits a different roof.
A ladder is the simplest. A secured ladder reaches the gutter line of a low roof, and the cleaner can work from it or from a roof ladder, a short hooked ladder laid flat on the slope that spreads the weight across many tiles and keeps boots off them.
A tower is a freestanding platform built up to the eaves. It gives a stable base and suits a roof edge that is too high for a ladder to be safe, though it needs firm, level ground.
Scaffold is a fixed structure around part or all of a building, with platforms and guard rails. It suits a high roof, a steep one or a long job, because it gives proper edge protection and room to work, but it takes time to build and dismantle and adds to the cost.
Eaves height, pitch, the number of slopes, the ground and the length of the job all feed into the choice. A conservatory or flat roof often calls for different access again. Our page on cleaning a conservatory roof explains why walking on the panels is never an option.
When a scaffold licence is needed
Scaffold on or over a public highway needs permission. The Highways Act 1980 (section 169) makes it an offence to erect or keep an obstructing scaffold over the highway unlicensed, and the highway takes in the pavement, verge and road. The authority that grants the licence is the highway authority.
Where the scaffold stands wholly in a private garden, no licence applies, as both Bracknell Forest's and Wokingham's pages state.
The highway authority depends on the address: Hampshire County Council for Rushmoor and Hart homes, Surrey County Council until 31 March 2027 for Surrey Heath, and the unitary council itself in Bracknell Forest and Wokingham.
On Hampshire County Council's page, the scaffolder must apply on its customers' behalf, the council wants ten clear working days' notice, and the fee is £211.90 for the first two weeks and £72 for each further two. Surrey County Council charges £208 per 28-day period with at least 10 working days' notice, and Bracknell Forest's residential licence costs £350 for 6 weeks, of which a £100 application fee is non-refundable. Elsewhere, ask who applies and we sort out the licence alongside the scaffolder.
Notice periods mean a scaffold job is planned ahead.
Safety and planning
Access is a safety question first. Falls from roofs and ladders are a recognised source of serious injury, and the HSE publishes guidance on working at height. A cleaner who sets up securely, uses edge protection where the work calls for it and keeps clear of fragile surfaces is following that guidance.
Under CDM 2015, a householder who hires a roofer is a domestic client, and a lone contractor has to prepare a construction phase plan. In plain terms, the roofer plans how the roof is reached, how people below are protected and how the site is left safe.
What to look for in a quote is that the access is named. Ask how the roof will be reached, whether scaffold or a tower is included in the price, who arranges any licence and whether VAT is included. A quote that says nothing about access may be hiding an extra.
Children and pets should stay indoors while ladders or towers are in use, windows on that side stay shut and cars and garden furniture move clear.
Neighbours should be told if equipment will sit near a boundary or block a shared path. Access is also affected by trees, outbuildings and parked cars, so a visit to the property comes before a price.
What we check before pricing the access
The survey notes the eaves height, the pitch, the ground around the house, the boundary and any trees, conservatories or extensions in the way, all in photographs.
That settles the access: ladder with roof ladder, tower or scaffold. If scaffold will stand on the highway, the licence is sorted out through the scaffolder, and the dates leave room for the waiting time.
Access is included in the single total we quote, so you are not surprised on the day. If a ladder is a sound way to reach the roof, that is what is quoted. If it is not safe, you are told why.
It also affects timing. A job that needs scaffold on the pavement cannot start until the licence is in place, so tell us early if you are working to a deadline, such as a sale.