The short answer
A roof replacement quote should describe the scope in writing, give one total price, say if VAT and scaffold are included, and set out when payments fall due. A contract signed at your own home normally carries a cooling-off right of 14 days. Citizens Advice recommends comparing at least 3 written quotes.
The scope, written in plain words
A quote is only useful if you can tell what you are buying. The scope should name the work the roofer will do from start to finish, in words you can follow. For a full replacement that normally means the strip of the old covering, the underlay or membrane, the battens, the new tiles or slates, the finishing at ridge, hips, verges and valleys, any flashings, and the scaffold.
It should name the materials themselves, not only the type. A tile has a make and a profile, and an underlay is breathable or it is not, so the quote should say which. Where the covering is reused, it should say so. If the survey found timber to repair, the quote should say what is allowed for and what happens if more turns up once the roof is open.
The scope should also state the access and the clean-up. Who erects the scaffold, where the skip stands, how long the roof stays open and how the site is left at night all belong on paper.
Each slope is measured and photographed during the survey, so the scope describes your own house. Ask for anything vague to be made specific, since an unclear quote is where disputes start.
One total price, with VAT and scaffold stated
You should receive a single total price for the job as described. Our own quotes work that way: one written total after the survey, never a menu of parts to add up. A single figure is the simplest to compare and the hardest to argue about later.
Two points need checking whichever firm you ask. The first is VAT. The standard rate is 20%, so a total without VAT is not the figure you will pay if the roofer is VAT-registered, and the quote should say whether VAT is included. Our page on VAT on roof insulation explains the special rate that applies to some energy-saving work.
The second is scaffold. Where the house stands on the pavement edge, scaffold on the highway falls under Highways Act 1980 s169 and the highway authority's licensing. Hampshire County Council wants the scaffolder, not you, to lodge the licence application, and it publishes a fee. Ask any firm whether scaffold, the licence and the waste are in the total, because a price that leaves them out will rise.
The page on roof replacement cost gives typical UK ranges, to see whether a figure is in the right area.
Payment terms and the cooling-off period
The quote should say when payment falls due and how much. A common pattern is a deposit at the start, perhaps a stage payment, and the balance on completion. Whatever the pattern, the amounts and the triggers should be written down, and the final payment should follow a finished job you have seen. Our page on a deposit for a new roof goes into this in more detail.
The law adds protection when you sign at home. Citizens Advice explains the cooling-off rule: it covers a service of £42 or more agreed somewhere other than the trader's own premises, such as your sitting room. It lasts a minimum of 14 days, counted from the day following signature. A roofer who begins inside those 14 days needs your request in writing, on email or paper.
An urgent repair is the exception. Where you call a trader out out for an urgent repair, regulation 28(1)(e) removes the cancellation right for that visit. A planned replacement signed after a survey is a different case.
Section 49 of the Consumer Rights Act 2015 sets the standard for the work itself: reasonable care and skill. For general advice, the Citizens Advice consumer helpline is 0808 223 1133.
Comparing quotes sensibly
Citizens Advice says to gather at least 3 written quotes from different traders before choosing. Comparing totals works only when every firm priced identical work. Give each the same brief, let each survey the roof, and read the scope before you read the total.
A low figure is a reason to look harder, not to sign. Check what is missing: is scaffold in, is the underlay replaced or kept, are the battens new, is waste taken away, and does the figure include VAT? A cheaper quote that leaves out the battens is not the same job, and the gap can reappear as an extra later.
Equally, the highest total is no proof of quality. What counts is whether you can see what you are paying for. A quote that arrived without anyone measuring your roof is an estimate.
Keep the written scope, the photos and any messages about changes together, so a later question has an answer on paper.
Our own quote follows the survey and the photos, in a single written price. The roof replacement page covers the whole job.