Re-roofing and the Regulations

Re-Roofing in Rushmoor: Building Regulations Explained

When a new roof needs approval, who checks it and what Part L adds

Many re-roofs need no Building Regulations application, but some do. The test turns on how much of the building is affected and on what the new covering weighs and does in a fire.

By Fortis Roofing Farnborough · · 9 min read

Homeowners in Farnborough, Cove, North Camp and Aldershot often ask one question before a re-roof: does it need building control? There is no one-line answer, and some of the answers repeated online are plain wrong, because they quote one percentage and forget the other.

The Planning Portal supplies the test everyone uses. It has two parts, and a re-roof stays clear of the Regulations only if it passes both. Two further triggers can pull a re-roof back in, one about weight and one about fire. Beyond those, the energy rules in Approved Document L can apply when a roof is renovated.

Rushmoor Borough Council and Hart District Council publish no threshold figure for re-roofing, so the Planning Portal wording is what you work from. We set it out below, then cover who checks the work in Rushmoor, the weight and Part L points and the planning side, and finish with a typical re-roof in the order it happens. It is general information and not legal advice, so confirm your own job with building control. The roof replacement page describes the jobs we carry out.

The Planning Portal test, in two parts

The Planning Portal's re-roofing page sets two conditions, and when both are met a building control application is not normally needed.

Condition one: the building envelope

Under 25 per cent of the whole building envelope may be affected. The envelope is the entire shell of the house: its walls, floor and roof together with the windows, doors, roof windows and rooflights. A roof is only one slice of that, so this limit is the easier one to meet.

Condition two: the roof itself

Under 50 per cent of the roof may be affected. This limit looks at the roof alone, and it is the one that catches a larger re-roof. Renewing a single slope on a house with several is a different matter from stripping the lot.

What the two conditions are not

Each figure belongs to its own yardstick. The 25 per cent figure measures the envelope, and the roof has its own 50 per cent figure. Applying one to the wrong thing gives a wrong answer in both directions, so be wary of any quote or website that offers a single number.

What "affected" means

The guidance talks of parts of the roof being affected, which in practice means the covering is being renewed. A repair to a few tiles affects very little. A re-roof of a whole house is likely to affect all of the roof and fail the second condition, and then the job needs building control or a registered approver.

Our answer on the 25 per cent re-roofing rule goes through the figures in more detail.

What brings a re-roof back in

Even a small re-roof needs approval if either of two further triggers applies. They are separate from the percentages.

A heavier covering

If the new covering weighs at least 15 per cent more than the old, approval is in play. The reason is structural: the timbers were sized for the old load. The Planning Portal advises having an engineer or surveyor check the roof before work begins. Approved Document A phrases the figure a little differently, calling a rise of more than 15% in roof loading a significant change, so name the source whenever you quote it.

The 15 per cent figure triggers Building Regulations approval. It does not trigger planning permission, which is a different system. Our answer on heavier roof coverings covers the checks.

Fire performance

The second trigger is fire. Approval is needed where the new covering would handle a fire quite differently from the old one, and a swap from a fire-resistant covering to a poorer one is the obvious case.

Why these matter in practice

On a like-for-like job, such as concrete tile for concrete tile, neither trigger usually applies. They become live when someone changes the type of covering: slate for concrete, for example, or a lighter covering for a heavier one. That is the moment to ask for the weights in writing and to ask building control.

Councils elsewhere

Some neighbouring councils name the work outright. Bracknell Forest Council's page lists new coverings on pitched or flat roofs as work that could need approval, and Basingstoke and Deane Borough Council carries a similar line. For Windsor and Maidenhead, the Royal Borough lists the re-tiling of a roof and its re-felting. Each statement covers that council's own addresses only.

Who checks the work in Rushmoor

In Rushmoor, building control is provided by the Hart and Rushmoor Building Control Partnership. It is a shared service between the two councils, based in Rushmoor's offices in Farnborough, and you can reach it on 01252 398715.

A shared service

A Rushmoor cabinet report records that the two councils formed the partnership as a shared service in July 2015. Hart's own pages confirm its building control is supplied by Rushmoor, so a house in Fleet or Yateley is handled by the team that handles one in Farnborough.

What the council's page says

Rushmoor's page on whether you need building control permission carries no re-roofing rule of its own. It sends readers to the Planning Portal's interactive guides, which is why the test above is the one to use.

Private approvers

The regime of registered building control approvers has been in force since 6 April 2024, and a homeowner can choose the council or a registered approver. On a private route, find out who is notifying the work and have that confirmed in writing.

Our part

Where approval applies to a re-roof, we pass on what the survey found, supply what the inspector asks for and arrange access for each visit. Which body you use is your choice.

Other councils

Councils outside Rushmoor and Hart have their own services. Wokingham uses Building Control Solutions with West Berkshire, and Surrey Heath uses its own consultancy. Check the council for your address.

Part L when a roof is renovated

Building Regulations are not only about structure. Approved Document L covers the saving of fuel and power, and a roof renovation can bring it in even when the percentages above are not exceeded, for a reason that comes from how the Regulations define terms.

What counts as renovation

The Building Regulations 2010 treat a wall, floor or roof as a thermal element, and renovating one means giving it an additional layer or swapping a layer it already has. Windows, doors, roof windows and rooflights fall outside the definition. Approved Document L also lists renewing a flat roof's waterproof membrane as renovation.

The figures

The 2021 edition with the 2023 amendments deals with existing elements in Table 4.3. For a roof the threshold is 0.35 W/(m²·K), and 0.16 is the figure to aim for. Paragraph 4.13 lets you settle for less when 0.16 is out of reach technically or functionally, or would need more than 15 years to repay itself: you upgrade as far as that payback allows, and generally to no worse than 0.7.

Not 0.15

The 0.15 figure comes from Table 4.2, which deals with elements newly added or replaced in a dwelling that already exists. Renovation uses 0.16.

A date to watch

The 2026 edition of Approved Document L takes effect on 24 March 2027 for ordinary dwelling work, with the tables renumbered 3.2 and 3.3 and the payback rule appearing as paragraph 3.14. The 2021 edition governs until then.

Insulation in practice

When a roof is open, adding insulation is easiest. Our answer on the building control certificate for a new roof explains the paperwork at the end.

Planning, conservation areas and listed homes

Building Regulations and planning are separate systems. A job can need one, both or neither.

Re-roofing a house

Class C of the permitted development rules takes in the re-roofing of a house, so a fresh covering is generally permitted development. A flat has none of those rights, and Rushmoor spells out that works to flats need planning permission unless they are like-for-like replacements that leave the appearance unchanged.

Rushmoor's conservation areas

Rushmoor lists nine designated conservation areas. Those in Farnborough itself are Farnborough Hill, Farnborough Street, South Farnborough and the St Michael's Abbey area. Class C carries no conservation area exclusion, though an Article 4 direction can take rights away. The roof-related direction we can point to is Cargate in Aldershot, which controls chimney and flue changes visible from public land. Ask Rushmoor's planning team whether a direction touches your address.

Listed buildings

Listing leaves a house its permitted development rights, yet any work that alters its character also needs listed building consent. That consent sits alongside any Building Regulations question and is decided by a different team.

Scaffolding on the pavement

Section 169 of the Highways Act 1980 requires a licence for scaffold that obstructs the highway. For Rushmoor and Hart that is Hampshire County Council, whose guidance has the scaffolding firm apply on the customer's behalf.

A Rushmoor re-roof in the order it happens

Time on site varies with the roof, the covering and the forecast, so we give the order and leave the days out. The order below is the usual one for a house roof in this part of Hampshire.

Before the first day

The survey records the pitch, the structure, the covering and any asbestos risk, with photographs. The written price follows, and we discuss the weight of the new covering and whether Building Regulations approval is needed. If scaffold is to stand on the pavement, the licence application is made, and Hampshire County Council wants the application in 10 clear working days before the start.

Scaffold and strip

Scaffold goes up first and the old covering comes off in sections, so the roof is closed at the end of each day. Battens and underlay are inspected as they are exposed.

Repairs and insulation

Any rotten timber is repaired, with photographs for you. If the roof is being renovated, insulation is checked against the Part L figure while the roof is open.

New underlay, battens and covering

The underlay and battens go on, followed by the covering from the eaves upward, then the ridge, hips and verges. Lead flashings are dressed at chimneys and walls.

Inspection and handover

If building control is involved, the inspector visits at the agreed stages. We take the scaffold down, clear the waste and tell you what was done. If a certificate applies, we help you obtain it.

More on approvals for re-roofs

Does replacing the tiles on one slope of my semi need building control?

Probably not, if the work touches under 25 per cent of the building envelope and under 50 per cent of the roof, and the new covering is neither 15 per cent or more heavier nor very different in a fire. If unsure, ring the Hart and Rushmoor Building Control Partnership on 01252 398715.

Do I need to tell Rushmoor if I use a private building control approver instead?

A registered building control approver can do the checking in place of the council, and that regime has run since 6 April 2024. The approver then handles the application, not the council. Keep a written note of who is notifying the work.

Does adding insulation during a re-roof count as part of the job?

It can. Renovating a roof, by replacing a layer of it, brings Approved Document L into play, and the upgrade figure for an existing roof is 0.16 W/(m²·K), subject to feasibility and payback. Roof windows are not thermal elements. Ask your building control body to confirm what applies to your roof.

Read next

Guide · 9 min read

Signs You Need a New Roof

One failure is a repair. A pattern of them, across several slopes and on an ageing roof, is…