Fortis Roofing Farnborough 01252 596302 Get a quote

Roofers in Ash

Roofs between London Clay and the sand heath of Ash Common

Ash is a village on the A323 at Guildford borough's western edge, on London Clay below Ash Common's heath. Every roof is surveyed, photographed and quoted once.

Get a free quoteCall 01252 596302

Ash's roofs, from clay village to heath ridge

Bungalow with a red clay tile roof, dormer and bay windows under a blue sky

Clay below the heath

The southern part of the parish, including Ash village, is on the London Clay.

Grey tiles stacked on new battens, loaded out for a re-roof

St Peter's, old and new

The church has an old nave and chancel with a west tower, and a large modern extension.

Flint and brick cottage with a mossy clay tile roof beside a road

A moated manor site

Part of Ash Manor's moated site on Ash Green Road is a scheduled ancient monument.

Map of Ash with Tongham, Ash Vale, North Camp, Aldershot, Farnborough marked around it.

Map data © OpenStreetMap contributors. Loads only when you ask for it.

Ash, on the A323 beside Ash Common

Tongham lies to the south-west, Ash Vale to the north, North Camp to the north-west, Aldershot to the west, Seale to the south, and Normandy to the east.

About 7.1 road miles south-east of Farnborough · Guildford Borough Council and Surrey County Council.

Get a free quote

Ash, clay and church

Ash roofs, from two stations to a scheduled moat

How Ash's geology, its two railway stations and its church shaped the village, which listings and which scheduled site touch roof work, and what Guildford's inspectors and Surrey's licence require.

Chapters of this guide and the figure each one turns on
No.ChapterThe figure it turns on
01London Clay, the Bagshot Sands ridge and two stationsAsh station 1849; Ash Green 1852
02St Peter's, a moated manor and the Old RectorySt Peter's Grade II*; moat scheduled in part
03Three questions Ash homeowners ask before a re-roofOwn inspectors; 28-day licence; 2027

Chapter 01 of 03

London Clay, the Bagshot Sands ridge and two stations

Ash's setting and growth in published records

  • 1801Inclosure Act enclosed much of the waste
  • 1849Ash station opened
  • 1852Ash Green station opened
  • 18,104residents of Ash parish, Census 2021
Source: Victoria County History of Surrey vol 3 (1911), British History Online; Guildford Borough Council settlement profile; ONS Census 2021, Nomis table PP002, Ash civil parish

Ash divides neatly by geology. The county history says the southern part of the parish, with St Peter's Church and Ash village, lies on London Clay, while the greater part covers the western side of the Bagshot Sands ridge at Ash Common and Fox Hills. Ash station opened in 1849 on one railway company's line and Ash Green station in 1852 on another's, and an Inclosure Act of 1801 enclosed much of the waste while keeping the villagers' rights to cut turf for fuel. The 2021 Census counted 18,104 residents in the civil parish.

A big parish with several stories

With a population above 18,000, Ash is a large place, and its roofs belong to different stories: an old village on clay, railway-age streets near two stations, and later growth across the sands. The record gives dates for the stations and the enclosure but not for any street, and certainly not for a roof covering. So we read each roof on its merits.

Our survey follows a fixed sequence. We start with the slopes, taking measurements and testing fixings by hand. We study the junctions with walls, chimneys and neighbouring roofs. We look at the roof space with a torch. We trace the water to the drain. At the end you get a report with the evidence in that order, and a repair is what you are quoted for when the evidence supports one.

Our pitched roofing page lists the commonest repairs, and our roof replacement page describes a full re-roof from stripping to final ridge. Wherever a house stands, leaves, moss and road dust collect in its gutters, and we pay particular attention to them, since overflow is blamed on the roof more often than it should be.

Overflow stains logged
Stains below a gutter joint are photographed, because they often explain a damp wall.

For the price, the survey gathers a few simple numbers: the area of each slope, the length of ridge and verge, the number of valleys and chimneys, and the count of outlets and downpipes. They are written into the report next to the photographs, and they are what a single written total is built from. If you wish to compare our figure with another firm's, the report gives you the facts to compare on.

Chapter 02 of 03

St Peter's, a moated manor and the Old Rectory

Ash's listed and scheduled sites and the consent route for each
SiteStatusConsent route for roof work
Church of St PeterGrade II*, NHLE 1029647, listed 14 June 1967Church of England faculty
Ash Manor moated siteScheduled ancient monument, part onlyScheduled monument consent
92 Ash StreetGrade II, NHLE 1188315Listed building consent
Hartshorn; Nos 1 to 3 including the Old RectoryGrade II, NHLE 1188299 and 1029654Listed building consent
Basingstoke Canal SouthConservation area within about 0.75 kmCheck with Guildford
Source: Historic England, National Heritage List for England; Guildford Borough Council heritage records; planning.data.gov.uk conservation-area dataset
Two roofs, one church
Old and new parts of a church roof are photographed and recorded separately.

St Peter's Church is in two parts: the old aisleless nave and chancel with a west tower, and a large modern chancel, nave and vestry added on the north side. Its five bells were cast by Thomas Mears in 1798. It is listed Grade II*, first listed on 14 June 1967, and as an Anglican church in use it falls under the ecclesiastical exemption, so roof work on either part goes through the faculty system and not through listed building consent.

Because the two parts of the church differ in age and detail, each roof has its own history, its own covering and its own weak points. The old nave and tower roofs may have been repaired many times, and the modern parts have had less time to wear. We record them separately, and we work to whatever specification the church's own architect and advisers set, with our measurements and photographs as evidence for their decision.

A scheduled moat

Part of Ash Manor's moated site on Ash Green Road is a scheduled ancient monument. Works to a scheduled monument need scheduled monument consent from the Secretary of State, and carrying them out without authority is an offence under the Ancient Monuments and Archaeological Areas Act 1979. Few roof jobs touch such land, but if one did, the consent would come first, so the survey notes where a property stands in relation to the scheduled area.

The figure7listedbuildings stand within 500 m of Ash's centre, Grade II houses to a Grade II* church7 within 500 mSource: Historic England, National Heritage List for England

Listed houses and the canal conservation area

7 listed buildings stand within 500 m of Ash's centre. Among them are 92 Ash Street, Hartshorn, and Nos 1 to 3 including the Old Rectory, all Grade II, and listed building consent is needed before work that would alter their character. The Basingstoke Canal South conservation area lies within about 0.75 km of the centre, and Guildford's map shows whether your address is inside it. Guildford also says that where an Article 4 direction applies, chimneys are protected, so we check its map before quoting for any stack work. Our chimney repairs page explains the repairs a stack may need.

The Old Rectory group and the houses on Ash Street are the kind of building where a repair has to follow the original in material and detail, and where a stack or a ridge may be the feature the planners care most about. Before work, we photograph each ridge, eaves line, chimney and junction, and we hold samples of any replacement tile or slate against the existing covering, so the match is judged on the roof itself.

Chapter 03 of 03

Three questions Ash homeowners ask before a re-roof

Four facts for an Ash roof job

  • Own serviceGuildford's building control, not shared
  • 28 daysSurrey County Council scaffold licence period
  • 10 daysworking days of notice Surrey County Council asks for
  • 2027year West Surrey Council replaces Guildford and Surrey
Source: Guildford Borough Council building control page; Surrey County Council scaffolding and hoarding page, reviewed 29 May 2026; Surrey County Council local government reorganisation page

Three questions come up before almost every re-roof in Ash. The first is who inspects the work. Guildford Borough Council runs its own building control service, and the alternative is a registered building control approver, chosen from the national register. A repair of a few tiles needs neither. For a re-roof, the Planning Portal sets the no-application ceilings at 25 per cent of the building envelope and 50 per cent of the roof, and says a covering 15 per cent or more heavier needs approval, with a structural check advised first.

Who licenses the scaffold?

If poles must stand on a road or footway, Surrey County Council licenses them at £208 per 28-day period and wants 10 working days of notice. Its page does not name the applicant, so the paperwork is something we arrange with the scaffolder before we send you the booked dates. Poles standing wholly on your own forecourt fall outside the licence scheme.

What changes in 2027?

On 1 April 2027 West Surrey Council replaces Guildford and Surrey County Council, and Surrey says services carry on as they are until then. A job that crosses that date is traced to its new holder before the poles go up, so that no licence, inspection or consent waits on an office that no longer exists, and you are told in writing who now answers for each.

Ash sits on the A323, and where a home fronts a busy road, scaffold position and deliveries are planned at the survey. We agree them with you, keep the pavement passable and clear the site each evening.

Weather shapes the dates. The Met Office's South Farnborough averages for 1991 to 2020 show 118 wet days a year and about 53 days of air frost, so a 28-day licence will see a share of both, and that is allowed for in the dates. Spare days go into the programme, and you are warned early if the forecast threatens it.

When the quote arrives it is one written total with the scaffold included. It is worth asking whether any other firm's is the same, and Citizens Advice suggests collecting written quotes from at least 3 traders. A clear written total is far easier to weigh than a verbal estimate.

Ash roof questions, from the old church to the 2027 move

Does the Grade II* listing of St Peter's Church affect roofs on nearby Ash houses?

No. The listing covers the church, whose roof work follows the faculty system. A house nearby needs consent only if it is itself listed, though a conservation area raises planning questions of its own. The National Heritage List and Guildford's maps show which case your address is, and we look both up at the survey.

Does the Basingstoke Canal South conservation area reach my Ash house?

It lies within about 0.75 km of the centre, so it may. Guildford's map shows the boundary and any Article 4 direction, under which chimneys are protected. We check both for every Ash address before quoting for work that changes how a roof looks, and the answer goes in the report.

Which body inspects a re-roof in Ash, and what changes in 2027?

Guildford Borough Council's own service inspects work that needs it, or a registered building control approver does if you go private. West Surrey Council replaces Guildford and the county on 1 April 2027. If your job crosses that date, we find out who then holds the file and tell you.

Can scaffold for an Ash re-roof stand on the pavement of the A323?

If the poles must stand on the road or footway, Surrey County Council's licence is needed, at £208 per 28-day period with 10 working days of notice. Where scaffold fits wholly on your own forecourt, no licence applies. We plan the position, the pedestrian route and the deliveries at the survey.

Village and heath-edge roofs we reach around Ash

Roofers in Farnborough

Get your free roof quote

An Ash roof, with the three questions answered first

Give us your Ash road and the problem. We book the survey, and one written price follows.

01252 596302

10-year workmanship guarantee, in writing.

WhatsApp us