
Clay below the heath
The southern part of the parish, including Ash village, is on the London Clay.

Roofs between London Clay and the sand heath of Ash Common
Ash is a village on the A323 at Guildford borough's western edge, on London Clay below Ash Common's heath. Every roof is surveyed, photographed and quoted once.

The southern part of the parish, including Ash village, is on the London Clay.

The church has an old nave and chancel with a west tower, and a large modern extension.

Part of Ash Manor's moated site on Ash Green Road is a scheduled ancient monument.
Map of Ash with Tongham, Ash Vale, North Camp, Aldershot, Farnborough marked around it.
Map data © OpenStreetMap contributors. Loads only when you ask for it.
Tongham lies to the south-west, Ash Vale to the north, North Camp to the north-west, Aldershot to the west, Seale to the south, and Normandy to the east.
About 7.1 road miles south-east of Farnborough · Guildford Borough Council and Surrey County Council.
Ash, clay and church
How Ash's geology, its two railway stations and its church shaped the village, which listings and which scheduled site touch roof work, and what Guildford's inspectors and Surrey's licence require.

| No. | Chapter | The figure it turns on |
|---|---|---|
| 01 | London Clay, the Bagshot Sands ridge and two stations | Ash station 1849; Ash Green 1852 |
| 02 | St Peter's, a moated manor and the Old Rectory | St Peter's Grade II*; moat scheduled in part |
| 03 | Three questions Ash homeowners ask before a re-roof | Own inspectors; 28-day licence; 2027 |
Chapter 01 of 03
Ash's setting and growth in published records
Ash divides neatly by geology. The county history says the southern part of the parish, with St Peter's Church and Ash village, lies on London Clay, while the greater part covers the western side of the Bagshot Sands ridge at Ash Common and Fox Hills. Ash station opened in 1849 on one railway company's line and Ash Green station in 1852 on another's, and an Inclosure Act of 1801 enclosed much of the waste while keeping the villagers' rights to cut turf for fuel. The 2021 Census counted 18,104 residents in the civil parish.
With a population above 18,000, Ash is a large place, and its roofs belong to different stories: an old village on clay, railway-age streets near two stations, and later growth across the sands. The record gives dates for the stations and the enclosure but not for any street, and certainly not for a roof covering. So we read each roof on its merits.
Our survey follows a fixed sequence. We start with the slopes, taking measurements and testing fixings by hand. We study the junctions with walls, chimneys and neighbouring roofs. We look at the roof space with a torch. We trace the water to the drain. At the end you get a report with the evidence in that order, and a repair is what you are quoted for when the evidence supports one.
Our pitched roofing page lists the commonest repairs, and our roof replacement page describes a full re-roof from stripping to final ridge. Wherever a house stands, leaves, moss and road dust collect in its gutters, and we pay particular attention to them, since overflow is blamed on the roof more often than it should be.

For the price, the survey gathers a few simple numbers: the area of each slope, the length of ridge and verge, the number of valleys and chimneys, and the count of outlets and downpipes. They are written into the report next to the photographs, and they are what a single written total is built from. If you wish to compare our figure with another firm's, the report gives you the facts to compare on.
Chapter 02 of 03
| Site | Status | Consent route for roof work |
|---|---|---|
| Church of St Peter | Grade II*, NHLE 1029647, listed 14 June 1967 | Church of England faculty |
| Ash Manor moated site | Scheduled ancient monument, part only | Scheduled monument consent |
| 92 Ash Street | Grade II, NHLE 1188315 | Listed building consent |
| Hartshorn; Nos 1 to 3 including the Old Rectory | Grade II, NHLE 1188299 and 1029654 | Listed building consent |
| Basingstoke Canal South | Conservation area within about 0.75 km | Check with Guildford |

St Peter's Church is in two parts: the old aisleless nave and chancel with a west tower, and a large modern chancel, nave and vestry added on the north side. Its five bells were cast by Thomas Mears in 1798. It is listed Grade II*, first listed on 14 June 1967, and as an Anglican church in use it falls under the ecclesiastical exemption, so roof work on either part goes through the faculty system and not through listed building consent.
Because the two parts of the church differ in age and detail, each roof has its own history, its own covering and its own weak points. The old nave and tower roofs may have been repaired many times, and the modern parts have had less time to wear. We record them separately, and we work to whatever specification the church's own architect and advisers set, with our measurements and photographs as evidence for their decision.
Part of Ash Manor's moated site on Ash Green Road is a scheduled ancient monument. Works to a scheduled monument need scheduled monument consent from the Secretary of State, and carrying them out without authority is an offence under the Ancient Monuments and Archaeological Areas Act 1979. Few roof jobs touch such land, but if one did, the consent would come first, so the survey notes where a property stands in relation to the scheduled area.
7 listed buildings stand within 500 m of Ash's centre. Among them are 92 Ash Street, Hartshorn, and Nos 1 to 3 including the Old Rectory, all Grade II, and listed building consent is needed before work that would alter their character. The Basingstoke Canal South conservation area lies within about 0.75 km of the centre, and Guildford's map shows whether your address is inside it. Guildford also says that where an Article 4 direction applies, chimneys are protected, so we check its map before quoting for any stack work. Our chimney repairs page explains the repairs a stack may need.
The Old Rectory group and the houses on Ash Street are the kind of building where a repair has to follow the original in material and detail, and where a stack or a ridge may be the feature the planners care most about. Before work, we photograph each ridge, eaves line, chimney and junction, and we hold samples of any replacement tile or slate against the existing covering, so the match is judged on the roof itself.
Chapter 03 of 03
Four facts for an Ash roof job
Three questions come up before almost every re-roof in Ash. The first is who inspects the work. Guildford Borough Council runs its own building control service, and the alternative is a registered building control approver, chosen from the national register. A repair of a few tiles needs neither. For a re-roof, the Planning Portal sets the no-application ceilings at 25 per cent of the building envelope and 50 per cent of the roof, and says a covering 15 per cent or more heavier needs approval, with a structural check advised first.
If poles must stand on a road or footway, Surrey County Council licenses them at £208 per 28-day period and wants 10 working days of notice. Its page does not name the applicant, so the paperwork is something we arrange with the scaffolder before we send you the booked dates. Poles standing wholly on your own forecourt fall outside the licence scheme.
On 1 April 2027 West Surrey Council replaces Guildford and Surrey County Council, and Surrey says services carry on as they are until then. A job that crosses that date is traced to its new holder before the poles go up, so that no licence, inspection or consent waits on an office that no longer exists, and you are told in writing who now answers for each.
Ash sits on the A323, and where a home fronts a busy road, scaffold position and deliveries are planned at the survey. We agree them with you, keep the pavement passable and clear the site each evening.
Weather shapes the dates. The Met Office's South Farnborough averages for 1991 to 2020 show 118 wet days a year and about 53 days of air frost, so a 28-day licence will see a share of both, and that is allowed for in the dates. Spare days go into the programme, and you are warned early if the forecast threatens it.
When the quote arrives it is one written total with the scaffold included. It is worth asking whether any other firm's is the same, and Citizens Advice suggests collecting written quotes from at least 3 traders. A clear written total is far easier to weigh than a verbal estimate.
No. The listing covers the church, whose roof work follows the faculty system. A house nearby needs consent only if it is itself listed, though a conservation area raises planning questions of its own. The National Heritage List and Guildford's maps show which case your address is, and we look both up at the survey.
It lies within about 0.75 km of the centre, so it may. Guildford's map shows the boundary and any Article 4 direction, under which chimneys are protected. We check both for every Ash address before quoting for work that changes how a roof looks, and the answer goes in the report.
Guildford Borough Council's own service inspects work that needs it, or a registered building control approver does if you go private. West Surrey Council replaces Guildford and the county on 1 April 2027. If your job crosses that date, we find out who then holds the file and tell you.
If the poles must stand on the road or footway, Surrey County Council's licence is needed, at £208 per 28-day period with 10 working days of notice. Where scaffold fits wholly on your own forecourt, no licence applies. We plan the position, the pedestrian route and the deliveries at the survey.
Get your free roof quote
Give us your Ash road and the problem. We book the survey, and one written price follows.
10-year workmanship guarantee, in writing.